Case Study

Tight Deadlines in Salt Lake City, Utah

Project Details

The customer required a very quick timeline on new racking for their 20,000 square-foot facility in a high seismic area.  The Storage Solutions team was able to get the building permitted, the rack fully installed, and occupancy granted prior to the deadline. We installed teardrop racking, wire decks, pallet supports, gravity conveyor, carton flow, trucker cage, and guarding products.

Final Thoughts

At Storage Solutions, we pride ourselves in our ability to guide our clients throughout their project life cycle as trusted partners. By leveraging our strong partner relationships and extensive internal experience, we can develop an array of solutions to fit your unique facility needs, budget, and timeline.

Let us walk alongside you to identify the best possible solution to optimize your facility and ensure your next project runs smoothly. Contact us and a member of our experienced team will be in touch shortly! For immediate assistance, please call us at (844)-249-2060.