Case Study

Third Party Logistics In California

The Situation

Storage Solutions is always up for a challenge but Project California comes with a challenge of meeting strict seismic standards.

To make sure the rack exceeded these standards without racking up extra expenses, Storage Solutions provided tube rack that fit the seismic requirements, in addition to mezzanines, VRCs and a wire security cage.

The Results

In this 390,000 square foot facility we installed approximately 4760 total bin sections/bays provided in a bin mezzanine; 4,432 – 24”D x 36”W, 328 – 36”D x 36”W, 3 VRCs, 4 Stairs, 44,000 shelves, 34,000 shelf dividers. Including 27,000 beams installed for racking and 1860 bays of tube rack installed for special seismic conditions. Lastly, over 440 linear feet of cantilever installed inside, 528 linear feet installed outside, and a 51’ x 61’ wire security cage installed.

4760

total bin sections/bays provided

1860

bays installed inside of tube rack designed for special seismic conditions

27000

beams installed

968

linear feet of cantilever installed inside and outside

Final Thoughts

At Storage Solutions, we pride ourselves in our ability to guide our clients throughout their project life cycle as trusted partners. By leveraging our strong partner relationships and extensive internal experience, we can develop an array of solutions to fit your unique facility needs, budget, and timeline.

Let us walk alongside you to identify the best possible solution to optimize your facility and ensure your next project runs smoothly. Contact us and a member of our experienced team will be in touch shortly! For immediate assistance, please call us at (844)-249-2060.