Case Study

Bottling Plant New England

Location
Maine

The Situation
The customer was adding production lines within in 800,000 square-foot facility, and would not have enough pallet storage to keep up with their increased output. 20,000 Pallet Positions of 4-High 7 & 13-Deep Dual Load Drive-In was installed. Resulting in a solution that maximized their storage density while maintaining their operational efficiency by loading/unloading/and transporting 2 pallets at a time.

Final Thoughts
At Storage Solutions, we pride ourselves in our ability to guide our clients throughout their project life cycle as trusted partners. By leveraging our strong partner relationships and extensive internal experience, we can develop an array of solutions to fit your unique facility needs, budget, and timeline.