3PL Parts Distributor

Project Illinois: The Storage Solutions team worked in a 250,000 sq. ft. facility installing a bin mezzanine and approximately 1,000 bays of racking!


The Project Details:

Square Footage:  300,000

  • Approx. 975 Bays of Racking Installed Inside
  • Over 11,000 Beams Installed
  • 85,000 Sq Ft Footprint for Racking
  • 1096 Total Bin Sections/Bays Provided for Bin Mezzanine
  • Approx. 9500 Sq Ft Footprint in Building
  • 1 VRC
  • 2 Stairs
  • 12,000 Shelves Installed
  • 4,000 Shelf Dividers Installed
  • 17’ x 60’ x 17’ Wire Crib Installed with Slide Gate
  • 160 Linear feet of Double High Guardrail
  • ON BUDGET

  • ON TIME

  • ON TARGET