Case Study

3PL Ohio

The Situation

Project Ohio was a project in a 1.086 million sq. ft. warehouse that utilized mezzanines and selective pallet rack. As is customary with most of our projects, the objective for Project Ohio was to optimize the use of warehouse space through efficient racking systems.

The Results

In this 1.086 Million square foot facility, our team installed 6,021 inside selective pallet rack bays which included all bays incorporating new and used materials, approximately 116,000 pallet rack locations provided, over 90,000 pallet rack beams and wire decks installed (90,000 of each, 180,000 combined), 400 cantilever columns installed, over 8,500 cantilever arms, and interior racking area footprint > 450,000 square feet. Whereas, within the 2,200 bin sections in two-level mezzanine, it included; bin mezzanine footprint nearly 45,000 sq ft, supports installed for 3rd level expansion when necessary, lighting and sprinkler provided in bins area, 2 VRC lifts installed, 3 stairs, and approximately 14,000 sq ft of Resindek and RoofDeck installed for walking.

6021

inside selective pallet rack bays

246

outside selective rack bays

2,200

bin sections in two-level mezzanine

Final Thoughts

At Storage Solutions, we pride ourselves in our ability to guide our clients throughout their project life cycle as trusted partners. By leveraging our strong partner relationships and extensive internal experience, we can develop an array of solutions to fit your unique facility needs, budget, and timeline.

Let us walk alongside you to identify the best possible solution to optimize your facility and ensure your next project runs smoothly. Contact us and a member of our experienced team will be in touch shortly! For immediate assistance, please call us at (844)-249-2060.