Auto Manufacturer

Project Atlanta took place over the course of four weeks.  The objective was to provide industrial storage and material handling systems for multiple facilities on site.  These systems included bin shelving systems, pallet racking systems, conveyor solutions and other miscellaneous needs.

The Project Details:

Square Footage:  175,000

  • 6,021 Inside Selective Pallet Rack Bays
  • 600 Rack Bays
    • Approx 9300 Rack Locations Provided
    • 352 42”D Bays Installed – Most 96” but some are 144” Tunnel Bays
    • 249 60”D Bays Provided – Most 96” but some are 144” Tunnel Bays
  • 885 Bin Sections
    • 225 36”W x 36”D Units
    • 660 36”W x 24”D Units
    • Over 50,000 Shelves Provided and Installed
    • Lighting Provided In Bins Area
  • 100 Linear Foot Wire Mesh Cage Area
  • Approx. 13,000 Footprint for Shelving Units
  • Approx. 58,000 Footprint for Racking
  • ON BUDGET

  • ON TIME

  • ON TARGET